Solar plants for factories in Telangana
Neumile has no listed project in Telangana yet. It serves factories in the state from its offices in Anantapur and Bangalore.
What a factory in Telangana should know
Open access means taking power from a plant built somewhere else, carried to your factory over the state grid. A captive plant is one your factory owns and uses mainly for its own power.
Source
TGERC Order on Determination of Additional Surcharge to be levied on Open Access consumers for the second half of FY 2026-27, 30 October 2026 (O.P. Nos. 28 and 29 of 2026)Last checked 15 November 2026
- From 1 November 2026 to 31 March 2027, a factory taking power through open access from anyone other than its distribution company pays an additional surcharge of ₹0.82 per unit. Nothing is recovered for October 2026.
- The additional surcharge is not charged on power a factory carries over the grid from its own captive plant.
Source
TGERC Order on Determination of Additional Surcharge to be levied on Open Access consumers for the first half of FY 2026-27, 10 March 2026 (O.P. Nos. 65 and 66 of 2025)Last checked 15 November 2026
- From 1 April to 30 September 2026 the additional surcharge was ₹0.13 per unit.
Source
TSERC Terms and Conditions of Open Access Regulation, 2024 (Regulation No. 1 of 2024), 15 March 2024Last checked 15 November 2026
- Cross-subsidy surcharge is not charged when a captive user carries power from its captive plant for its own use, as long as it meets the captive rules in the Electricity Rules, 2005 (clause 22.1).
- A factory can take green power through open access if its contracted demand or sanctioned load is 100 kW or more, from one connection or from several in the same electricity division added together. The regulation says 'there shall be no limit of supply of power for the captive consumers' (clause 9.2); Neumile confirms in the off-site assessment how this applies to your plant.
- To count as captive, a single owner must hold at least 26% of the plant and use at least 51% of the power it generates each year. The regulator checks both every year (clause 7).
Rules not listed here could not be confirmed from the regulator's own documents when this page was last checked. Neumile confirms them for your factory in the site study or the free off-site assessment. The main terms, such as open access and net metering, are explained on the factory solar page.
Neumile's projects in Telangana
Neumile has no listed project in Telangana yet. It serves factories in Telangana from its two offices:
- AnantapurFlat no-302, 4th Floor, Bhaskar Homes, Khaja Nagar, Near RTC Bus stand, Anantapur 515001
- Bangalore#26, 3rd Cross, Gandhinagar KHB Colony, Yelahanka, Bangalore 560064
Work out what a plant would do for your factory
A plant on your roof or land
The calculator opens set to Telangana. Enter your monthly units, tariff and space for a first range of plant size, yearly saving, cost and payback.
Calculate your savings in TelanganaAn off-site plant
If your site cannot hold the plant you need, an off-site plant your factory owns can supply the rest through the grid. Group captive means several factories or businesses own one plant together and divide its power between them. Neumile's assessment of an off-site plant is free, and it confirms the current open access rules and charges for your factory.