Skip to content
Rows of solar panels stretching across a wide field under a blue sky, with a covered cable run in front

Own your solar plant. Cut your factory's power cost.

Neumile designs, builds and maintains solar plants from 10 kWp to 10 MW for factories in Andhra Pradesh, Telangana and Karnataka.

Clients

  • Tata Power
  • Hero Future Energies
  • SCPL
  • Jakson Green
  • Ayana Renewable Power
  • Induo Assist
  • Viridis
  • Sungwoo Hitech
  • SolarSquare
  • Dr. Reddy's Laboratories
  • 3F Industries

See what your factory would save

Start with your state and the units your factory uses in a month. The calculator then asks what you pay per unit, when the factory runs and where a plant could go, and shows the plant that fits, what limits its size, and the saving and payback as ranges.

Two ways to own a solar plant

Start with what your own roof or land can hold.

On your roof or land

A rooftop plant, or one ground-mounted on the factory's own land.

Size
10 kWp to 10 MW

How it works, from estimate to maintenance

  1. You, on this site

    Calculate your saving

    The calculator gives a first estimate for a plant on your roof or land.

    Open the calculator
  2. Neumile, at your factory

    Site study

    Neumile visits the factory to look at the roof or land where the plant would go.

  3. Neumile

    Free quote

    You receive a quote for the plant, based on what the site study found. The quote costs nothing.

  4. Neumile

    Approvals and construction

    Neumile handles the approvals and builds the plant: foundations, module mounting structures and electrical works.

  5. Neumile

    Maintenance

    Once the plant is running, Neumile maintains it.

Why build with Neumile

A large-plant record

  • 130 MWpGalivedu, Andhra PradeshTata Power
  • 50 MWPavagada, KarnatakaSCPL
  • 360 MWKurnool, Andhra PradeshHero Future Energies and Jakson GreenUnder construction

A safety drill at Kurnool

Workers at the Kurnool solar park held an electrical-shock mock drill. About the drill

Workers in helmets lined up for a safety briefing on site
Kurnool, Andhra Pradesh — 360 MW — Hero Future Energies and Jakson Green, under construction

Maintenance, advice and construction for developers

  • Maintenance and health checks

    Yearly maintenance, paid health checks, and fixing plants that produce less than they should.

  • Advice before you build

    Feasibility studies and design, checking another contractor's work on your behalf, and guidance on off-site plants.

  • Construction for developers

    Piling, civil works, module mounting structures (MMS), AC/DC electrical works, installation and commissioning (I&C), and operation and maintenance (O&M) on large plants.

Questions factory owners ask

More on owning a plant, open access and group captive is on the factory solar plants page.

Factory solar plants
How much will my factory save, and what share of my bill can solar cover?

It depends on how many units you use each month, what you pay per unit, the hours your factory runs and the roof or land you have. Solar produces only in daylight, so a factory that runs round the clock uses a smaller share of it directly. The calculator on this site turns those figures into a plant size, the share of your use it covers and a yearly saving range for a plant on your roof or land. Neumile then checks them in a site study before giving a free quote.

What will the plant cost, and how long will it take to pay back?

The calculator gives a rough plant cost and the years to pay back, both as ranges worked out from your own units and tariff. Your actual price is in the quote, which is free and follows a site study.

The estimate leaves out loans and the tax saving from depreciation; ask your tax adviser to confirm the current depreciation rule.

What size of plant suits my factory, and what if my roof is too small?

Neumile builds plants from 10 kWp to 10 MW. The right size is limited by your daytime power use, the roof or land you have, and the state's net-metering rules. If your roof or land cannot hold a plant big enough for your use, an off-site plant that you own can supply the rest through the grid.

Rooftop, ground-mounted, or off-site through open access: which suits my factory?

Start with what your own site can hold: a plant on the factory roof, or ground-mounted on your own land. If that cannot cover your use, an off-site plant can supply the rest through open access or group captive. Neumile offers both.

Grid charges for off-site plants change during the year, so this site gives no saving estimate for them. Neumile works out the charges for your factory in an off-site assessment, which is free.

Who handles the approvals?

On a turnkey contract, Neumile does: the contract covers design, buying the equipment, construction, and the approvals and liaison work.

Who maintains the plant once it is built?

Neumile offers yearly maintenance for the plant it builds for you. For plants that produce less than they should, Neumile also offers paid health checks and fixes.

What plants of my factory's size has Neumile worked on?

Neumile's project list includes a 0.507 MWp plant for Sungwoo Hitech at Penukonda, Andhra Pradesh, which is under construction; a 5 MW plant for Induo Assist in Bangalore; a 3 MW plant for Viridis in Coimbatore; and plants of 69 kW and 24 kW for SolarSquare in Chennai.

Estimate your saving from your monthly units and tariff

Free quote after a site study.