Skip to content
Solar panel field beside a dirt road under a grey sky

Solar plants for factories in Andhra Pradesh

Six of Neumile's listed projects are in Andhra Pradesh, and one of its two offices is in Anantapur.

What a factory in Andhra Pradesh should know

Open access means taking power from a plant built somewhere else, carried to your factory over the state grid. A captive plant is one your factory owns and uses mainly for its own power.

  • Net metering up to 500 kW; net billing, which pays less for spare power, up to 1,000 kW or the contracted demand, whichever is lower (clause 5.3).
  • A factory can take green power through open access if its contracted demand or sanctioned load is 100 kW or more, from one connection or from several in the same electricity division added together. A factory supplied by its own captive plant has no minimum load.
  • Cross-subsidy surcharge and additional surcharge are not charged when a factory carries power over the grid from a captive plant it has set up for its own use. Whether a plant counts as captive is decided under the Government of India's Electricity Rules.
  • For 2026-27, a captive plant on the factory's own premises pays a grid support charge of ₹25 per kW per month, or ₹15 per kW per month for a rooftop plant under net or gross metering. The charge is on the capacity used for the factory's own load, and it is not charged while the plant has been shut down for more than two months.

Rules not listed here could not be confirmed from the regulator's own documents when this page was last checked. Neumile confirms them for your factory in the site study or the free off-site assessment. The main terms, such as open access and net metering, are explained on the factory solar page.

Neumile's projects in Andhra Pradesh

Neumile projects in Andhra Pradesh: client, plant size and place
ClientPlant sizePlace
Tata Power130 MWpGalivedu, Andhra Pradesh
Hero Future Energies60 MWpNandyala, Andhra Pradesh
Jakson Green Limited30 MWpUppalapadu, Andhra Pradesh
Ayana Renewable Power18.11 MWpKadapa, Andhra Pradesh
Sungwoo Hitech AP Private Limited (KIA)Under construction0.507 MWpPenukonda, Andhra Pradesh
Hero Future Energies and Jakson Green LimitedUnder construction360 MWKurnool, Andhra Pradesh

All Neumile projects

Work out what a plant would do for your factory

A plant on your roof or land

The calculator opens set to Andhra Pradesh. Enter your monthly units, tariff and space for a first range of plant size, yearly saving, cost and payback.

Calculate your savings in Andhra Pradesh

An off-site plant

If your site cannot hold the plant you need, an off-site plant your factory owns can supply the rest through the grid. Group captive means several factories or businesses own one plant together and divide its power between them. Neumile's assessment of an off-site plant is free, and it confirms the current open access rules and charges for your factory.