Solar plants for factories in Andhra Pradesh
Six of Neumile's listed projects are in Andhra Pradesh, and one of its two offices is in Anantapur.
What a factory in Andhra Pradesh should know
Open access means taking power from a plant built somewhere else, carried to your factory over the state grid. A captive plant is one your factory owns and uses mainly for its own power.
Source
APERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulation, 2023 (Regulation 4 of 2023), order of 22 February 2024, clause 5.3Last checked 15 November 2026
- Net metering up to 500 kW; net billing, which pays less for spare power, up to 1,000 kW or the contracted demand, whichever is lower (clause 5.3).
Source
APERC (Green Energy Open Access, Charges, and Banking) Regulation, 2024 (Regulation No. 3 of 2024), Andhra Pradesh Gazette, 2 May 2024Last checked 15 November 2026
- A factory can take green power through open access if its contracted demand or sanctioned load is 100 kW or more, from one connection or from several in the same electricity division added together. A factory supplied by its own captive plant has no minimum load.
- Cross-subsidy surcharge and additional surcharge are not charged when a factory carries power over the grid from a captive plant it has set up for its own use. Whether a plant counts as captive is decided under the Government of India's Electricity Rules.
Source
APERC Order on Tariff for Retail Sale of Electricity during FY 2026-27, 25 March 2026, clause 3.12Last checked 15 November 2026
- For 2026-27, a captive plant on the factory's own premises pays a grid support charge of ₹25 per kW per month, or ₹15 per kW per month for a rooftop plant under net or gross metering. The charge is on the capacity used for the factory's own load, and it is not charged while the plant has been shut down for more than two months.
Rules not listed here could not be confirmed from the regulator's own documents when this page was last checked. Neumile confirms them for your factory in the site study or the free off-site assessment. The main terms, such as open access and net metering, are explained on the factory solar page.
Neumile's projects in Andhra Pradesh
| Client | Plant size | Place |
|---|---|---|
| Tata Power | 130 MWp | Galivedu, Andhra Pradesh |
| Hero Future Energies | 60 MWp | Nandyala, Andhra Pradesh |
| Jakson Green Limited | 30 MWp | Uppalapadu, Andhra Pradesh |
| Ayana Renewable Power | 18.11 MWp | Kadapa, Andhra Pradesh |
| Sungwoo Hitech AP Private Limited (KIA)Under construction | 0.507 MWp | Penukonda, Andhra Pradesh |
| Hero Future Energies and Jakson Green LimitedUnder construction | 360 MW | Kurnool, Andhra Pradesh |
Work out what a plant would do for your factory
A plant on your roof or land
The calculator opens set to Andhra Pradesh. Enter your monthly units, tariff and space for a first range of plant size, yearly saving, cost and payback.
Calculate your savings in Andhra PradeshAn off-site plant
If your site cannot hold the plant you need, an off-site plant your factory owns can supply the rest through the grid. Group captive means several factories or businesses own one plant together and divide its power between them. Neumile's assessment of an off-site plant is free, and it confirms the current open access rules and charges for your factory.