Solar plants for factories in Karnataka
Neumile has two listed projects in Karnataka: a 50 MW plant at Pavagada for SCPL, and a 5 MW plant in Bangalore for Induo Assist. Its Bangalore office is in Yelahanka.
What a factory in Karnataka should know
Open access means taking power from a plant built somewhere else, carried to your factory over the state grid. A captive plant is one your factory owns and uses mainly for its own power.
Source
KERC (Grid Interactive Distributed Solar Photovoltaic (DSPV) Plants) Regulations, 2026, Notification No. KERC/F-34/V-38/2026-27/2395, 19 August 2026, Karnataka Gazette, 24 August 2026Last checked 15 November 2026
- Net metering is open to every consumer category, for a plant from 1 kW up to the sanctioned load or contract demand or 1,000 kW, whichever is lower. These limits apply until net-metered, virtual and group net-metered solar in the state together reach 3 GW (regulations 3.6 and 4.1).
- Under net billing, gross metering or behind-the-meter, the plant can be as large as the sanctioned load or contract demand. A behind-the-meter plant can go above that only with a generator, storage or inverter that sets its own voltage reference (regulations 4.2, 4.3 and 4.6).
- A factory with several connections in the same name and category can use group net metering, with one plant of at least 5 kW and up to their combined sanctioned load or contract demand (regulation 4.4).
- Panels can go on roofs, on walls, or on raised structures on the ground inside the premises, with at least 8 feet of clearance at the lowest point. The clearance rule does not apply to a captive behind-the-meter plant (regulation 4.7.2).
- Fixed or demand charges on the electricity bill are still payable, however much power the plant sends to the grid (regulation 5.1.7).
- A factory already taking power through open access can also install a net-metered plant on its premises, but power left over after the monthly adjustment is taken by the distribution company at no cost (regulation 3.5).
Source
KERC Order No. KERC/S/F-32/V-29/2407, Determination of tariff in respect of DSPV/SPV Plants for the period from 25.08.2026 to 30.06.2029, 25 August 2026Last checked 15 November 2026
- For plants commissioned from 25 August 2026 to 30 June 2029 under net metering (1 to 1,000 kW), net billing or gross metering, the distribution company pays ₹3.11 per unit for surplus power from panels with Indian-made cells and ₹2.34 per unit for other panels, under a 25-year agreement, unless the regulator orders otherwise. The higher rate applies only after the distribution company inspects and certifies the cells.
Rules not listed here could not be confirmed from the regulator's own documents when this page was last checked. Neumile confirms them for your factory in the site study or the free off-site assessment. The main terms, such as open access and net metering, are explained on the factory solar page.
Neumile's projects in Karnataka
| Client | Plant size | Place |
|---|---|---|
| SCPL | 50 MW | Pavagada, Karnataka |
| Induo Assist | 5 MW | Bangalore, Karnataka |
Work out what a plant would do for your factory
A plant on your roof or land
The calculator opens set to Karnataka. Enter your monthly units, tariff and space for a first range of plant size, yearly saving, cost and payback.
Calculate your savings in KarnatakaAn off-site plant
If your site cannot hold the plant you need, an off-site plant your factory owns can supply the rest through the grid. Group captive means several factories or businesses own one plant together and divide its power between them. Neumile's assessment of an off-site plant is free, and it confirms the current open access rules and charges for your factory.