
Construction for solar plant developers
Piling, civil works, module mounting structures (MMS), AC/DC electrical works, installation and commissioning (I&C), and operation and maintenance (O&M) on large plants in Andhra Pradesh and Karnataka.
Plants Neumile has worked on for developers
| Client | Plant size | Place |
|---|---|---|
| Hero Future Energies and Jakson Green LimitedUnder construction | 360 MW | Kurnool, Andhra Pradesh |
| Hero Future Energies | 60 MWp | Nandyala, Andhra Pradesh |
| SCPL | 50 MW | Pavagada, Karnataka |
| Jakson Green Limited | 30 MWp | Uppalapadu, Andhra Pradesh |
| Ayana Renewable Power | 18.11 MWp | Kadapa, Andhra Pradesh |

Kurnool, Andhra Pradesh — 360 MW — Hero Future Energies and Jakson Green, under construction

Uppalapadu, Andhra Pradesh — 30 MWp — Jakson Green

Kadapa, Andhra Pradesh — 18.11 MWp — Ayana Renewable Power
Workers at the Kurnool solar park held an electrical-shock mock drill. About the drill
All projects, including factory plantsKinds of work Neumile takes on
- Piling
- Civil works
- Module mounting structures (MMS)
- AC/DC electrical works
- Installation and commissioning (I&C)
- Operation and maintenance (O&M)
Ways to hire Neumile
- Installation and commissioning contractor
- Detailed engineering and design if required, part of the procurement, and the complete construction.
- EPC management
- Detailed engineering and design, and project management, without the installation.
- Turnkey EPC
- Detailed engineering and design, complete procurement and construction, with the approvals and liaison.
- Manpower
- Workers provided to your project.
Questions developers ask
What construction work does Neumile take on for solar plant developers?
Piling, civil works, module mounting structures (MMS), AC/DC electrical works, installation and commissioning (I&C), and operation and maintenance (O&M).
Can Neumile take a single work package rather than the whole plant?
Yes. A developer can hire Neumile for one kind of work, such as piling or AC/DC electrical works, rather than the whole plant.
What size of plant does Neumile work on for developers?
The developers' plants on Neumile's project list range from 18.11 MWp at Kadapa to 360 MW at the Kurnool solar park, which is under construction.
Send us the work package you are hiring for
Tell us the plant size, the place and the scope of work.
Or call +91-9133587722
or write to adi@neumile.green