What would a solar plant save your factory?
Enter your monthly units, what you pay per unit, when the factory runs and where a plant could go. You get the plant that fits, what limits its size, and the saving as a range.
Your estimate
Answer the questions and press Estimate. You will see the plant that fits on your roof or land, what limits its size, the units it makes a year, and the saving, cost and payback as ranges.
How we estimate this
Draft figures, awaiting Neumile's confirmation.
- Your yearly use is the units you use in a month, times 12.
- A plant on site can cover only part of that, because solar makes power in daylight. How much depends on when the factory runs.
- The plant size is the smallest of four limits: the size that covers that part of your use, the space you entered, the state's net-metering limit, and your sanctioned load. Below 10 kW we flag the plant as too small to quote; above 10 MW it is capped.
- Units a year are the plant size times the units a plant makes per kW in a year.
- The yearly saving is those units times your rate per unit, less the yearly upkeep. The high figure uses the low plant cost; the low figure assumes 10% less output and the high plant cost.
- Payback is the plant cost divided by the yearly saving.
- Carbon dioxide avoided is the units a year times the carbon dioxide in a unit from the grid.
The figures used
Rate per unit we fill in for you
- Andhra Pradesh: ₹ 6.30
- Telangana: ₹ 7.65
- Karnataka: ₹ 6.70
Andhra Pradesh: Industry at 11 kV, normal hours (15:00 to 18:00 and 22:00 to 24:00). Most solar power is made between 10:00 and 15:00, when the rate is ₹5.55; 06:00 to 10:00 costs ₹7.30 to ₹7.80.
Telangana: Industry at 11 kV, ₹7.65 per unit (billed per kVAh). Not confirmed from the tariff order itself: the schedule refused direct download, and news reports say retail tariffs were not changed for 2026-27.
Karnataka: HT-2(a) industry energy charge of ₹6.70 per unit, from a news report; the tariff order itself could not be opened. A separate charge of 56 paise per unit (May 2026 to April 2027) is not added.
Sources: Andhra Pradesh tariff schedule for 2026-27, industry rates on page 173; Telangana southern distribution company, tariff schedule (refused direct download; rate read from search results); Mercom, report that Telangana kept its retail tariffs for 2026-27 (news report); ThePrint, report of the Karnataka tariff order of March 2026 (news report, not the order). Checked 15 November 2026.
Units a plant makes per kW in a year
- 1,664
The regulator assumes a plant runs at 19% of its full rating across the year: 0.19 × 8,760 hours = 1,664 units per kW.
Andhra Pradesh and Telangana: No figure for this state was found, so Karnataka's regulator's figure is used.
Source: Karnataka Electricity Regulatory Commission, solar tariff order of 25 August 2026. Checked 15 November 2026.
Plant cost per kW, low
- ₹ 36,015
The regulator's cost for non-home plants using Indian-made cells, which net-metered plants commissioned after 31 December 2026 must use.
Andhra Pradesh and Telangana: No figure for this state was found, so Karnataka's regulator's figure is used.
Source: Karnataka Electricity Regulatory Commission, solar tariff order of 25 August 2026. Checked 15 November 2026.
Plant cost per kW, high
- ₹ 45,000
The regulator's cost for home systems of 1 to 10 kW, based on the national benchmark; used as the top of the range because factory plants usually cost less per kW.
Andhra Pradesh and Telangana: No figure for this state was found, so Karnataka's regulator's figure is used.
Source: Karnataka Electricity Regulatory Commission, solar tariff order of 25 August 2026. Checked 15 November 2026.
Yearly upkeep, as a share of plant cost
- 1%
1% of the plant cost a year. The regulator adds 5.72% a year to this; we use the first year's figure.
Andhra Pradesh and Telangana: No figure for this state was found, so Karnataka's regulator's figure is used.
Source: Karnataka Electricity Regulatory Commission, solar tariff order of 25 August 2026. Checked 15 November 2026.
Largest plant allowed under net metering
- Andhra Pradesh and Telangana: 500 kW
- Karnataka: 1 MW
Andhra Pradesh: Net metering up to 500 kW; net billing, which pays less for spare power, up to 1,000 kW or the contracted demand, whichever is lower (clause 5.3). Changes made since 2023 were not checked, so Neumile confirms this limit in the site study.
Telangana: From news reports of the 2025 rooftop regulation: net metering up to 500 kW, and industrial plants up to 80% of sanctioned load. Not confirmed from the regulation itself; the 80% rule is not applied here.
Karnataka: Net metering is allowed up to the sanctioned load or 1,000 kW, whichever is lower. Larger plants are allowed under net billing, which pays less for spare power.
Sources: Andhra Pradesh Electricity Regulatory Commission, rooftop solar regulation 4 of 2023, clause 5.3; Power Peak Digest, report of Telangana's 2025 rooftop solar regulation (news report, not the regulation); Karnataka Electricity Regulatory Commission, distributed solar regulations 2026 (regulation 4.1.2). Checked 15 November 2026.
Share of a year's use a plant on site can cover
- 100% daytime only, 60% two shifts, 40% round the clock
Roughly the share of a factory's working hours that fall in daylight. A factory that runs only in daylight can take all its power from a plant sized to its use.
No public source: a working figure for Neumile to confirm.
Roof needed per kW
- 108 sq ft
The ministry says 10 to 12 square metres of shade-free roof per kW. We use 10 square metres (108 sq ft).
Source: Ministry of New and Renewable Energy, rooftop solar questions and answers, 28 April 2022. Checked 15 November 2026.
Land needed per MW
- 4 acres
The ministry gives an average of four acres per MW; the real figure depends on the shape of the land.
Source: Ministry of New and Renewable Energy, press release of 20 July 2023. Checked 15 November 2026.
Carbon dioxide per unit from the grid
- 0.675 kg
India's grid average for 2025-26: 0.675 tonnes of carbon dioxide per 1,000 units.
Source: Central Electricity Authority, CO2 Baseline Database user guide, version 22.0, August 2026. Checked 15 November 2026.
Yearly loss in panel output
- 0.93%
Karnataka's regulator counts no yearly loss; a company at the regulator's hearing proposed 0.93% a year. The low estimate already assumes 10% less output, which covers this over the payback period.
Source: Karnataka Electricity Regulatory Commission, solar tariff order of 25 August 2026. Checked 15 November 2026.
Left out on purpose
Not included: the tax saving from depreciation (a tax adviser must confirm the current rule) and loans.
Andhra Pradesh's grid support charge on solar plants (see the Andhra Pradesh page).
Off-site plants get no figure: what they save depends on grid charges that change during the year, so Neumile works it out in a free assessment.